SAN LORENZO HIGH SCHOOL
New Modular Buildings
Jtec is providing project management and construction management services for the $83M Measure O and the $130M Measure B bond projects. As part of this bond program we are overseeing the design, preparation of the site and the installation of three new modular classroom buildings on the San Lorenzo High School campus. The project includes:
Excavation for rat slab installation necessary for the modular classroom installation
Installation of equipment inside the modular buildings including television monitors, ceiling hoist systems and building signage
Electrical and low voltage work inside the buildings which included security, fire alarm systems, public address systems, data and Internet, underground conduits and electronic door locks
Utility connections
Installation of two new metal canopies and required foundations
Installation of new landscaping, irrigation, paving and outdoor gathering area hardscapes. The hardscaping work included new paving and striping on parking lots, demolition of an existing site wall, and relocation of existing storage containers.
Client:
San Lorenzo USD
Location:
San Lorenzo, CA
Delivery Method:
Multi-Prime
Project Cost:
$4.7 Million
Role:
Project Management
Construction Management